Successful Desilting

At the end of 2016, the former school pond in the area of the outdoor lab in Berlin-Zehlendorf was thoroughly desilted as part of landscape conservation measures. After the redevelopment, nature is recapturing the pond and less than a year later there are clearly visible transformations. The school pond can now serve again as a valuable habitat for flora and fauna and an illustration example for visitors of the outdoor lab. The desilting was planned and carried out in cooperation with the consultants from Ingenieurb├╝ro Obermeyer from Potsdam.